The hole is then lined with geotextile sheeting which permits water to empty by but helps prevent the void filling with soil. The crates are then placed inside the excavated gap, and afterwards the geotextile is wrapped round the total construction. Nevertheless, remember there are moves afoot for making soakaways https://vivconstruct.com