3. Soon after rig positioning, generate the casing into the bottom. Drive steel casing to your minimum amount a depth of one m down below the bottom level to acquire lateral hundreds and actions at web site. The metal casing also overcome troubles resulting from groundwater all through piling. From https://shanedmgmb.pointblog.net/the-best-side-of-cast-in-situ-piles-in-dhaka-75401129